Product Parameters
Required Service Panel Breaker
(Build-in Branch Breaker) |
50-60HZ
Dedicated 3-Pole |
Power wiring |
N/A |
Connector Type |
5 Wire-L1,L2,L3,N,PE |
Charging Control |
Plug and Play or RFID Card |
Display Screen |
4.3-inch LCD Screen |
Indicators |
4 LED indicators-Power/Connect/Charging/Fault |
External Communication |
LAN (RJ-45) and Wi-Fi |
OCPP Protocol (Optional) |
1.6 or 2.0.1. |
Working environment |
'-25 to 50TC (-22to 131"F) ambient |
Operating Humidity |
Up to 95% non-condensing |
Altitude |
≤2000m |
Cooling Method |
Natural Coling |
Protection Ratings |
IP54 |
RCD |
TYPE B |
Over Voltage Protection |
YES |
Under Voltage Protection |
YES |
Over Load Protection |
YES |
Short Circult Protection |
YES |
Earth Leakage Protection |
YES |
Ground Protection |
YES |
Over-temp Protection |
YES |
Surge Protection |
YES |
Dimension (H X W X D, mm) |
417*295*126MM |
Weight |
3-phasec<12kg |
Charging Cable Length |
4m or Customize Length |
Enclosure Material |
Front-Panel: Tempered Glass; Back-cover: Metal Plate |
The 14kW AC charging pile provides AC 50Hz, rated voltage 220V AC power supply for electric vehicles equipped with on-board chargers.
Product Description
Functional Features
- Uses AC220V AC input.
- Provides three installation options: column-mounted, vertical, and wall-mounted.
- Exterior structure made of sheet metal and some ABS plastic components.
- Incoming switch equipped with a leakage protection function and an emergency stop button.
- Utilizes a single-phase electronic energy meter for electricity measurement, communicates with the main control board via RS-485 interface.
- Features a 4.3-inch 480x272 resolution color touchscreen display for touch button operation and charging mode settings.
- Utilizes a non-contact smart card reader to read IC card information, communicates with the main control board via RS-485 interface. Charging user identification, user information recording, and charging fee calculation are managed by the main control board's backend program.
- The main control board incorporates a microcontroller with an embedded operating system. Charging modes include automatic full charging, fixed time, fixed amount, and fixed quantity. It can reserve an RS-485 networking communication interface and provide optional GPRS networking method.
Operating Environment
- Installation inclination ≤ 5%.
- Atmospheric pressure: 80kPa to 110kPa.
- Monthly average relative humidity ≤ 90% (25°C) without condensation.
- Operating air temperature: -25°C to 50°C, 24-hour daily average temperature ≤ 35°C.
- Severe level of vibration and shock ≤ Grade I, magnetic field induction intensity in any direction ≤ 1.5mT.
- The environment must not contain explosive substances, corrosive metals, harmful gases that damage insulation or conductive media. It should be free from excessive water vapor and severe mold presence.
- Avoid direct sunlight in the installation location. For outdoor installations, it is recommended to provide shading facilities for the charging station.
Detailed Photos
FAQ
Q: Are you the factory or trading company?
A: We are factory with more than 20 years in the field of DC power supply solution, traction power supply and new energies. We warmly welcome you for the visit.
Q: How is the delivery time?
A: Generally, the delivery time between 7-30 days after getting client's payment.
For accurate info depends on the products and the quantity, we can make further communication on this.
Q: Do you have MOQ requirements?
A: MOQ is 1 set for most of the products, only MOQ for 7KW, 11KW, 22KW AC EV charger is 10 sets.
A: How long is your warranty time?
Q: We provide 2 years warranty for our clients.
Q: Can you provide customized service?
A: Yes. we have been getting involved with the OEM and ODM projects since 2004.
So that we can provide professional customized service for our clients.
Q: Do you have after sales service?
A: Yes. We have after saels service team can give support quickly just in case you got problems.
Q: Do you make the test after finishing production?
A: Yes, our production engineer team will do the test while goods finished, and we will prvoide the test info to clients for reference before delivery.